Preparing The 8001-22C System For Operation After You Remove And Replace Internal Parts - IBM 8001-22C Manual

Installing the ibm power system
Hide thumbs Also See for 8001-22C:
Table of Contents

Advertisement

DANGER: Multiple power cords. The product might be equipped with multiple AC power cords or
multiple DC power cables. To remove all hazardous voltages, disconnect all power cords and power
cables. (L003)
(L005)
>240VA
CAUTION: Hazardous energy present. Voltages with hazardous energy might cause heating when
shorted with metal, which might result in splattered metal, burns, or both. (L005)
6. Place the system into the service position. For instructions, see "Placing an 8001-22C or 8005-22N
system into the service position" on page 104.
CAUTION:
Do not place any object on top of a rack-mounted device unless that rack-mounted device is
intended for use as a shelf. (R008)
(L012)
CAUTION: Pinch hazard. (L012)
7. Remove the service access cover. For instructions, see "Removing the service access cover from an
8001-22C or 8005-22N system" on page 102.
Preparing the 8001-22C system for operation after you remove and
replace internal parts
Learn how to prepare the IBM Power System S822LC for Big Data (8001-22C) or the IBM CS822
(8005-22N) system for operation after you remove and replace internal parts.
Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap attached. If not, attach it now.
94
Power Systems: Installing the IBM Power System S822LC for Big Data (8001-22C)
or

Advertisement

Table of Contents
loading

This manual is also suitable for:

S822lc

Table of Contents