Steps - commissioning, inspection and maintenance
For further information regarding the individual steps, see the page indicated
Commissioning steps
Inspection steps
Maintenance steps
•
1. Checking the DHW cylinder........................................... 34
•
•
•
2. Checking the electrical connections............................ 34
•
3. Filling the DHW cylinder................................................ 34
•
4. Filling the solar thermal system and checking for
•
•
5. Checking the thermal insulation of the cold water and
•
•
6. Commissioning the system........................................... 35
•
•
7. Inspection and maintenance......................................... 36
•
•
8. Shutting down the system
•
•
9. Checking the function of safety valves
•
•
10. Checking the plug with integral residual current
Commissioning, inspection, maintenance
leaks................................................................................. 34
DHW pipes
device............................................................................... 36