Siemens SIMATIC PCS 7 Manual page 53

Maintenance station
Hide thumbs Also See for SIMATIC PCS 7:
Table of Contents

Advertisement

8 Creation of the PDM Network Structure for the Maintenance Project
If you use HART Multiplexers or Wireless HART Gateways, follow the steps
described in Chapter 7.1.3.
Figure 8-14
No further settings are necessary for the sample project. An OPC server must
Note
only be inserted here if SNMP devices (such as PCs, switches, and other
network objects) are to be monitored in the PDM MS, and if the SNMP devices
are to be added and configured in the SNMP Configuration of the OPC Server.
PDM Maintenance Station
Entry ID: 109776936,
V1.0,
02/2020
53

Advertisement

Table of Contents
loading

Table of Contents