Download Print this page

Arrow Storage Products Woodlake Owner's Manual & Assembly Instructions page 27

Advertisement

Step 14
S27 ctr
(40)
1
Install a left roof panel at the left
rear corner of the roof.
2
Install 4 roof panels in the se-
quence and positions shown. Follow
fastener sequence and instructions
in Steps 13 thru 15 while fastening
roof panels.
NOTE
Narrow roof panel rib (with bead
on it) is always overlapped by
wide rib of adjacent panel
3
Cover the joint at the peak with
weather stripping tape. Unroll the
tape and press it down over the
opening at the ridge as you install
each roof panel. Do not cut the tape
at this time.
NOTE
If roof beam holes do not line up
with the roof panel holes, shift the
building from left to right.
If this does not help, your building
may not be level. Shim the
corners until holes line up.
Roof Assembly
6641
(9)
6529
6529
6640
Parts Needed For
2
4
6
8
STEP
1
6641 Left Roof Panel
Fasten At
Overlap with
Bolt
Screws To
Roof Beam
27
6641 Left Roof Panel (1)
6529 Roof Panel (4)
1
3
5
7
FRONT
STEP
3
Screws To
Roof Beam
Do not fasten
at this time
6640
6529
6529
6641
STEP
2
6529 Roof Panel

Advertisement

loading

This manual is also suitable for:

Wl1010Eh1010Br1010