Carrier 16LJ-F Series Operation Manual page 33

Absorption chiller
Hide thumbs Also See for 16LJ-F Series:
Table of Contents

Advertisement

Purge indicatio
n
lamp (green)
Purge pump
on-off switch
1)
Open the g
gas ballast v
purge pum
mp oil will be
5-2-2. m
maintenance
of purge pu
If the p
purge tank p
pressure doe
Proced
dure of repla
acing the pu
a) Ope
en the drain
cock, and re
b) Clos
se the drain
cock, and r
c) Fill f
fresh oil thro
ough the oil
win
dow of the r
red dot 5 ~ 6
Stop th
he purge pu
mp when yo
The ty
pe of rotary
pump oil dif
type of
f oil can low
er the pump
If the u
ultimate pres
ssure canno
collect
ted on the bo
ottom of the
agent.
Gas b
allast valve
P
urge pump
valve slightl
ly until you c
come dirty e
easily.
ump
es not reach
h available v
rge pump o
il
elease all oi
il of the pum
emove the c
cap.
filling port. R
Refueling, th
6mm.
ou replace th
he oil.
ffers depend
ding on vapo
p performanc
ce. So use t
ot be attained
d by oil chan
e pump case
e. In that eve
Suction
Purge tank
V3
B valve
V1
1
Pu
rge pump
Purge unit
can hear the
e exhaust so
acuum leve
l, replace th
mp.
he oil level s
hould be ke
or pressure,
viscosity, e
the attached
d pump oil.
nge, sludge
or other dep
ent, overhau
l is required
5-2
Upper
shell
V2
Lo
Lower shell
ound. If you
u open it full
he purge pum
mp oil.
ept above the
e oil level
etc. The use
of a wrong
posit may ha
ave
d. Contact ou
ur service
Drain p
plug
Oil fillin
ng
Oil leve
el gauge
Drain
y,

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents