4-3. OPERATION

4-3-1. Pre-operation check
Check the following items before starting operation.
(1) Check of the setting point of the chilled water outlet temperature
Make sure that the chilled water outlet temperature is set as specified.
As for the indication of set value, please refer to Section 4-4.
(2) Check of the hot water line
a) Make a daily inspection.(Refer to Section 5.)
b) Check that the valve(s) is open.
NOTE : The chilled water pump and the cooling water pump
should be operated by on-off signal from the chiller.
When the chiller starts, these equipments also will start automatically.