PMP 400/430 and PTP 200/230 Series Configuration and User Guide
10.
Adjust down tilt per calculations done
during Planning. Confirm down tilt after
the radio is operational using SMs in the
field at selected test locations.
Procedure 4: Assembling a 4.9 GHz AP, and attaching to tower
1.
Perform a parts check to
ensure all parts are present.
2.
Assemble unit per the
instructions that come with
the kit.
pmp-0042 (March 2014)
Page 80 of 98