NOTE: Component arrangement on Control; Legend on Power Schematic
* PremierLink and RTU- - OPEN control labels overlay a portion of the base unit control label. The base unit label drawing and the control option drawing
are required to provide a complete unit control diagram.
With energyxr system factory installed energy recovery single -package rooftop unit (rtu) gas heating/electric cooling units 15 to 25 nominal tons with puronr (r -410a) refrigerant (12 pages)