Carrier 48HC D17 Series Service And Maintenance Instructions page 32

Nominal 15 to 25 tons with puron (r-410a) refrigerant
Table of Contents

Advertisement

Return Air Without Economizer
The sampling tube is located across the return air opening
on the unit basepan. See Fig. 40. The holes in the
sampling tube face downward, into the return air stream.
The sampling tube is attached to the control module
bushing that extends from the control box through the
partition into the return air section of the unit.
sensing tube is shipped mounted to the Indoor Blower
Housing and must be relocated to the return air section of
the unit. Installation requires that this sensing tube be
attached to the control module bushing. See installation
steps.
Return Air Detector Sampling Tube
*RA detector must be moved from shipping position to operating position by installer
Fig. 40 - - Typical Return Air Detector Location
Return Air With Economizer
The sampling tube is inserted through the side plates of
the economizer housing, placing it across the return air
opening on the unit basepan. See Fig. 41. The holes in the
sampling tube face downward, into the return air stream.
The sampling tube is connected through tubing to the
return air sensor that is mounted on a bracket high on the
partition between return filter and controller location. The
Return Air Sensor is shipped in a flat- - mounting location.
Installation requires that this sensor be relocated to its
operating location and the tubing to the sampling tube be
connected. See installation steps.
The
Return Air Detector module
(shipping position shown)*
Controller module
C07307
FIOP Smoke Detector Wiring and Response
All units: The FIOP smoke detector is configured to
automatically shut down all unit operations when a smoke
condition is detected. See Fig. 42, Smoke Detector
Wiring.
Highlight A: JMP 3 is factory- - cut, transferring unit
control to smoke detector.
Highlight B: Smoke detector NC contact set will open on
smoke
alarm
condition,
conductor.
Highlight C: 24V power signal using the ORN lead is
removed at Smoke Detector input on Central Terminal
board (CTB); all unit operations cease immediately.
PremierLinkt
and
RTU- - Open
operating functions (fan, cooling and heating) are
terminated as described above. In addition:
Highlight D: On smoke alarm condition, the smoke
detector NO Alarm contact will close, supplying 24V
power to GRA conductor.
Highlight E: GRA lead at Smoke Alarm input on LCTB
provides 24V signal to FIOP DDC control.
PremierLink: This signal is conveyed to PremierLink
FIOP's TB1 at terminal TB1- - 6 (BLU lead). This signal
initiates the FSD sequence by the PremierLink control.
FSD status is reported to connected CCN network.
RTU- - OPEN: The 24V signal is conveyed to the
RTU- - OPEN J1- - 10 input terminal. This signal initiates the
FSD sequence by the RTU- - OPEN control. FSD status is
reported to connected BAS network.
Using Remote Logic: Five field use conductors are
provided for additional annunciation functions.
Additional Application Data: Refer to Catalog No.
HKRNKA- - 1XA for discussions on additional control
features of these smoke detectors including multiple unit
coordination. See Fig. 42.
32
de- - energizing
the
ORN
Controls:
Unit

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

48hc d20 series48hc d24 series48hc d28 series

Table of Contents