Table 3-4     Dimensions Between the Front and Rear Columns and Scale Positions
Dimension Between Front and Rear Columns (mm)
740
730
720
710
700
690
680
670
660
650
Note - If you have difficulty laying a thick cable into the cable support, move the cable
support forward to a fixing point that makes the work easier.
c. Close the rear door of the rack, and confirm that the cable support does not
Figure 3-32     Completed Cable Support Attachment
64
Fujitsu SPARC M12-1 Installation Guide ・ June 2021
interfere. If the cable support interferes with the rear door, remove the cable
support. Even if you remove the cable support, leave the rails secured to the
rack with the two M6 screws.
Scale Position
1st
2nd
3rd
4th
5th
6th
7th
8th
9th
10th