Fujitsu SPARC M12-1 Installation Manual page 12

Hide thumbs Also See for SPARC M12-1:
Table of Contents

Advertisement

Table 1-1     Workflow for the SPARC M12-1 (continued)
Step (Work Time (*1))
Work Description
2
Before installing the system, check
the safety precautions, system
specifications, and necessary
conditions for installation.
3
Prepare the necessary tools/
information for installation.
4
Confirm the delivered components.
5
Install the rack.
6
Mount the SPARC M12-1 in the rack.
7
If there is a PCI expansion unit,
mount it in the rack.
8
If there are optional components,
mount them in the SPARC M12-1 or
the PCI expansion unit.
9
Connect serial cables and LAN
cables to the SPARC M12-1. Attach
the core to the power cord, and
connect the power cord to the power
supply unit.
10
If there is a PCI expansion unit,
connect the link cable and
management cable to the PCI
expansion unit.
Attach the core to the power cord,
and connect the power cord to the
power supply unit.
Initial diagnosis (approx. 30 minutes)
11
Connect the system management
terminal to the SPARC M12-1, and
turn on the input power.
12
Log in to the XSCF of the SPARC
M12-1, and check the firmware
version number, altitude setting, and
time setting.
2
Fujitsu SPARC M12-1 Installation Guide ・ June 2021
Reference
"Chapter 2 Planning and Preparing
for System
Installation"
"3.1 Preparing the Necessary
Tools/Information for
Installation"
"3.2.1 Confirming the Delivered
Components of the SPARC
"3.2.2 Confirming the Delivered
Components of the PCI Expansion
Unit"
See the manual for each rack.
"3.3 Confirming the
Rack"
"3.4.1 Mounting the SPARC M12-1
in a
Rack"
"3.4.2 Mounting the PCI Expansion
Unit in a
Rack"
"3.5.1 Mounting Optional
Components in the SPARC
"3.5.2 Mounting Optional
Components in the PCI Expansion
Unit"
"4.1 Connecting Cables to the
SPARC
M12-1"
"4.2 Connecting Cables to the PCI
Expansion
Unit"
"5.1 Connecting the System
Management Terminal to the
"5.2 Turning On the Input Power
and Starting the
XSCF"
"5.3 Logging In to the
XSCF"
"5.4 Checking the XCP
Version"
"5.5 Checking the Altitude
"5.6 Setting the
Time"
Required
Required
Required
M12-1"
Optional
Required
Required
Optional
Optional
M12-1"
(*3)
Optional
(*3)
Required
Optional
(*4)
Required
Chassis"
Required
Setting"

Advertisement

Table of Contents
loading

Table of Contents