Installation
6. Install a 1/2" 15 degree swing-check vacuum breaker at the top of the return coil header using
Note: Vacuum breakers should have extended lines from the vent ports to the atmosphere or
7. Install a "Gate" type valve in the supply branch line as close as possible to the steam main and
8. Install a "Gate" type valve in the return branch line as close as possible to the condensate return
9. Install a strainer as close as possible to the inlet of the control valve and steam trap(s).
10. Steam trap selection should be based on the maximum possible condensate flow and the
11. Install a Float-and-Thermostatic (FT) type trap to maintain proper flow. They provide gravity
or,
12. Position the outlet or discharge port of the steam trap at least 12" below the outlet connection
40 through 130 Ton units
Utilizes two steam coils stacked together. These two coils must be piped in a parallel arrangement.
The steps listed below should be used in addition to the previous steps.
recommended piping configuration for the steam coils.
Figure 29. Hot Water Piping (20 - 75 Ton)
64
the tapped pipe connection. Position the vacuum breaker as close to the coil as possible.
connect each vent line to the return pipe on the discharge side of the steam traps.
upstream of any other device.
main and downstream of any other device.
recommended load factors.
drains and continuous discharge operation. FT type traps are required if the system includes
either;
a. an atmospheric pressure/gravity condensate return;
b. a potentially low pressure steam supply.
on the coil(s). This will provide adequate hydrostatic head pressure to overcome the trap losses
and assure complete condensate removal.