Trane IntelliPak SAHL Series Installation, Operation And Maintenance Manual page 58

Commercial single-zone rooftop air conditioners with cv, vav, or szvav controls
Table of Contents

Advertisement

Installation
Note: Do not rely on the gas train shutoff valves to isolate the unit while conducting gas pressure/
Connecting the Gas Supply Line to the Furnace Gas Train
Follow the steps below to complete the installation between the supply gas line and the furnace.
Refer to
1. Connect the supply gas piping using a "ground-joint" type union to the furnace gas train and
2. Adjust the inlet supply pressure to the recommended 7" to 14" w.c. parameter for natural gas.
3. Ensure that the piping is adequately supported to avoid gas train stress.
Table 16. Sizing Natural Gas Pipe Mains and Branches
Pipe Run (ft)
* Table is based on a specific gravity of 0.60. Use
Table 17. Specific Gravity Multipliers
Specific Gravity
58
leak test. These valves are not designed to withstand pressures in excess of 14" w.c. or 0.5
psig.
Figure 24
through
Figure 27
check for leaks.
Gas Supply
1-1/4"
Pipe
10
1050
20
730
30
590
40
500
50
440
60
400
70
370
80
350
90
320
100
305
125
275
150
250
175
225
200
210
Multiplier
0.50
1.10
0.55
1.04
0.60
1.00
0.65
0.96
for the appropriate gas train configuration.
Gas Input (Cubic Feet/Hour)*
1-1/2"
2"
Pipe
Pipe
1600
3050
1100
2100
890
1650
760
1450
670
1270
610
1150
560
1050
530
990
490
930
460
870
410
780
380
710
350
650
320
610
Table 17
for the specific gravity of the local gas supply.
2-1/2"
3"
Pipe
Pipe
4800
8500
3300
5900
2700
4700
2300
4100
2000
3600
1850
3250
1700
3000
1600
2800
1500
2600
1400
2500
1250
2200
1130
2000
1050
1850
980
1700
RT-SVX36G-EN
4"
Pipe
17500
12000
9700
8300
7400
6800
6200
5800
5400
5100
4500
4100
3800
3500

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents