1. OPERATING PROCEDURE OF SYSTEM

1.1. Startup the Radar System

(1) Turn on the circuit breaker of the Antenna Unit and the Signal Processing Unit (storage box)
The Antenna Unit and the Signal Processing Unit are in the waiting status.
(2) Turn on the power of the Display Unit, and place the main outlet to supply a power for the
Antenna Unit and the Signal Processing Unit
(3) Start the observation from the menu of the Display Unit
Output the data periodically with displaying images, and display the data image.
In process
Signal processing unit
(storage box).
S2E-17-0208_OM_WR2120_C
1. The circuit breaker is in the Signal
Processing Unit (storage box).
2. To turn on the circuit breaker.