Commissioning Check List; Installation Record - Rinnai FM10NA Operation & Installation Manual

Gas instantaneous water heater
Table of Contents

Advertisement

COMMISSIONING CHECK LIST

A commissioning check list is provided on the appliance front cover to enable the installer to step through the
correct commissioning procedure when installing a Rinnai water heater.
The check list can also assist the installer to identify potential installation errors that may prevent the appliance
from operating correctly.

INSTALLATION RECORD

The Installation Record is a reference for the end user, help line staff and service technicians. Ensuring that this
information is available here will be helpful in the event that a service enquiry is required.
Installer Details
Installation Company Name:
Telephone / Mobile Phone:
Certificate of Compliance / Certification No.:
Authorised Persons - Licence No.:
System Details
Water Heater - Model Number *:
Water Heater - Serial Number *:
* This information will need to be copied from the data plate, located on the left hand side of appliance.
Rinnai
Address:
Email:
Installers Name:
Installers Signature:
Installation Date:
Installation Address:
/
17
COMMISSIONING
HW_GI_FM10 OIM

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fm10la

Table of Contents