29. START-UP / COMMISSIONING SHEET

THIS EQUIPMENT HAS BEEN FACTORY FIRED AND TESTED PRIOR TO
SHIPMENT. HOWEVER, THIS APPLIANCE IS NOT "PLUG & PLAY". IT RE-
QUIRES COMMISSIONING AND FIELD ADJUSTMENT / SPECIFICATIONS
CONFIRMATION TO ENSURE SAFE AND EFFICIENT OPERATION.
AS PER I&O MANUAL AND LOCAL CODES
CONTRACTOR NAME: ................................................................................DATE................................
ADDRESS:............................................................................................................................................
............................................................................................................................................................
CITY:........................................................................................
PHONE:...................................................................................
CELL: .....................................................................................
JOB SITE......................................................................................................CITY................................
HEATER MODEL NUMBER:............................................................................................................
Located on burner rating plate
HEATER SERIAL NUMBER: ...........................................................................................................
Located on burner rating plate
TO ENSURE THAT SITE CONDITIONS ARE COMPATIBLE WITH THE HEATER'S PER-
FORMANCE AND TO ALLEVIATE NUISANCE CALL-BACKS, THE FOLLOWING START-
UP NEEDS TO BE COMPLETED BY THE QUALIFIED GAS INSTALLER.
THIS EQUIPMENT HAS BEEN FACTORY FIRED AND TESTED BEFORE DELIVERY, NEVERTHELESS
WARNING
IT IS NOT A PLUG IN APPLIANCE..IT DOES REQUIRE COMMISSIONING AND FIELD ADJUSTMENTS
During start up, material coatings used in the production process of tubes and reflectors will
"burn off" and create smoke during the first hour of operation. This is temporary and normal.
Please ensure that there is sufficient ventilation to adequately clear the smoke from the space.
Notify site and safety personnel to ensure that alarm systems are not unduly activated.
TO ENSURE THAT SITE CONDITIONS ARE COMPATIBLE WITH THIS HEATER, AND TO
ALLEVIATE NUISANCE CALL BACKS FOR THE CONTRACTOR, THE FOLLOWING
START-UP NEEDS TO BE COMPLETED BY THE LICENSED GAS INSTALLER.
A CONTRACTOR IS CALLING FOR TECHNICAL SUPPORT,
MUST PROVIDE THE FOLLOWING INFORMATION
FROM HIS COMPLETED COMMISSIONING REPORT ON NEXT PAGE
COMMISSIONING REPORT