Installation Checklist & Record; Installation & Commissioning Checklist - Rinnai RHFE-559FDT3 Operation & Installation Manual

Energysaver-fdt power flued gas space heater
Table of Contents

Advertisement

INSTALLATION CHECKLIST & RECORD
INSTALLATION & COMMISSIONING CHECKLIST
Commissioning MUST be completed before customer handover. Refer to the Commissioning
Instruction sheet attached behind the front panel of this appliance.
IMPORTANT
These Instructions MUST be returned to the this storage location upon the completion.
1.
Complete BOTH the "INSTALLATION RECORD" and "FINAL CHECKLIST" below.
2.
Instruct customer on the operation of the Energysaver.
3.
Ensure the customer understands the content of this manual.
Advise the customer that during the initial burning in period of approximately 2 hours, some
vapour and smell may be emitted from the heater. This is normal operation for a new heater.
NOTE
During this period the heater should be operated on 'High' and the space being heated should be
well ventilated.
The louvre grille and rear cover fitted to this appliance reduce the risk of fire and injury, no part
of it should be permanently removed.
WARNING
Ensure the Customer understands that:
No part of this appliance should be permanently removed.
Paper or other material must not be forced into the louvres of this appliance.
Young children and the infirm should be supervised at all times while in the vicinity of this
appliance while it is in operation or able to be turned on.
Rinnai
26
ES_FDT3 OIM

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rhfe-1005fdt3

Table of Contents