Commissioning; Thermostat - Rinnai DD180 Operation And Installation Manual

Table of Contents

Advertisement

Installation Information - Commissioning
Fill tank as detailed on previous page and commission the Rinnai continuous flow water heater
in accordance with the commissioning check sheet attached to the front cover of the unit.
Installation Information - Thermostat
To ensure the over-temperature and energy cutout is set, press the 'reset' button on the

thermostat.

Thermostat
setting
Rinnai New Zealand
The thermostat must be set to 65 °C. Turning the adjustment knob
clockwise decreases the temperature setting and turning it clockwise
increases the temperature setting.
Rinnai advise that the thermostat must only be adjusted or removed by
an electrician or other suitably qualified tradesperson.
Reset timer will shut off the pump every 15 minutes for a few seconds.
Demand Duo Lite Operation/Installation: 11451-A
14
01-09

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dd340Ddlt160e180lDdlt160e180nDdlt160e340lDdlt160e340n

Table of Contents