Terminal Locations: D1H-D4H - Trane TR200 Operating Instructions Manual

D-frame, 110-400 kw
Hide thumbs Also See for TR200:
Table of Contents

Advertisement

Do not wire a starting or pole-changing device
between the frequency converter and the motor
Connect the 3-phase motor wiring to terminals
96 (U), 97 (V), and 98 (W)
Earth (ground) the cable in accordance with the
instructions provided

2.4.3.1 Terminal Locations: D1h-D4h

Illustration 2.7 Terminal Locations D1h
Illustration 2.8 Terminal Locations D3h
BAS-SVX54B-EN
TR200 D-Frame Operating Instructions
Torque terminals in accordance with the
information provided in 10.3.4 Connection
Tightening Torques
Follow motor manufacturer wiring requirements
Installation
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents