Electrical Installation; General Requirements - Trane TR200 Operating Instructions Manual

D-frame, 110-400 kw
Hide thumbs Also See for TR200:
Table of Contents

Advertisement

Installation

2.4 Electrical Installation

2.4.1 General Requirements

This section contains detailed instructions for wiring the
frequency converter. The following tasks are described:
Wiring the motor to the frequency converter
output terminals
Wiring the AC mains to the frequency converter
input terminals
Connecting control and serial communication
wiring
After power has been applied, checking input
and motor power; programming control terminals
for their intended functions
WARNING
EQUIPMENT HAZARD!
Rotating shafts and electrical equipment can be hazardous.
All electrical work must conform to national and local
electrical codes. It is strongly recommended that instal-
lation, start up, and maintenance be performed only by
trained and qualified personnel. Failure to follow these
guidelines could result in death or serious injury.
CAUTION
WIRING ISOLATION!
Run input power, motor wiring and control wiring in three
separate metallic conduits or use separated shielded cable
for high frequency noise isolation. Failure to isolate power,
motor and control wiring could result in less than
optimum frequency converter and associated equipment
performance.
10
TR200 D-Frame Operating Instructions
BAS-SVX54B-EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents