Standard Operation Process
Document No. : Hawking FA disassembly SOP
Process Name :
Disassmble Edp cable/FFC
圖二
Fixture list(fixture specifications)
Step:
1.Disassemble Edp cable , pull the belt
of cable from CNTR
2.Disassemble TH pad board FFC
❖ Open the connector cover,take
out Cable/FFC
圖一
Qty
Tabulator: Ya Zhu
Station:
1.00
Ver. :
Date
Fixture list(fixture specifications)
Department:
10(1/2)
2018/03/12
:
Qty
IE