Advertisement

Product End-of-Life Disassembly Instructions
Product Category: Notebooks and Tablet PCs
Marketing Name / Model
[List multiple models if applicable.]
HP 14s Laptop PC
Purpose: The document is intended for use by end-of-life recyclers or treatment facilities. It provides the basic instructions for the
disassembly of HPI products to remove components and materials requiring selective treatment, as defined by EU directive
2002/96/EC, Waste Electrical and Electronic Equipment (WEEE).
NOTE: Recyclers should sort plastic materials into resin streams for recycling based on the ISO 11469 plastic marking code on the
plastic part. For any questions on plastic marking, please contact

1.0 Items Requiring Selective Treatment

1.1 Items listed below are classified as requiring selective treatment.
1.2 Enter the quantity of items contained within the product which require selective treatment in the right column, as applicable.
Item Description
Printed Circuit Boards (PCB) or Printed Circuit
Assemblies (PCA)
Batteries, excluding Li-Ion batteries.
Li-Ion batteries. Include all Li-Ion batteries if more than
one is provided with the product (such as a detachable
notebook keyboard battery, RTC coin cell, etc.)
Mercury-containing components
Liquid Crystal Displays (LCD) with a surface greater than
100 sq cm
Cathode Ray Tubes (CRT)
Capacitors / condensers (Containing PCB/PCT)
Electrolytic Capacitors / Condensers measuring greater
than 2.5 cm in diameter or height
External electrical cables and cords
Gas Discharge Lamps
Plastics containing Brominated Flame Retardants
EL-MF877-00
Template Revision C
Last revalidation date 04-01-2018
Notes
With a surface greater than 10 sq cm
All types including standard alkaline, coin or button style
batteries
Battery(ies) are attached to the product by (check all
that apply with an "x" inside the "[ ]"):
[ X ] screws
[
[
[
NOTE: Add detailed removal procedures including
required tools in the sections 3.1/3.2.
For example, mercury in lamps, display backlights,
scanner lamps, switches, batteries
Includes background illuminated displays with gas
discharge lamps (14")
DC Cable for External Power Supply
HPI instructions for this template are available at
HP's Sustainability
Contact.
] snaps
] adhesive
] other. Explain
EL-MF877-01
Quantity of
items
included in
product
0
1
0
1
0
0
0
1
0
0
Page 1

Advertisement

Table of Contents
loading

Summary of Contents for HP 14s

  • Page 1 Marketing Name / Model [List multiple models if applicable.] HP 14s Laptop PC Purpose: The document is intended for use by end-of-life recyclers or treatment facilities. It provides the basic instructions for the disassembly of HPI products to remove components and materials requiring selective treatment, as defined by EU directive 2002/96/EC, Waste Electrical and Electronic Equipment (WEEE).
  • Page 2 Quantity of items Item Description Notes included in product weighing > 25 grams (not including PCBs or PCAs already listed as a separate item above) Components and parts containing toner and ink, Include the cartridges, print heads, tubes, vent including liquids, semi-liquids (gel/paste) and toner chambers, and service stations.
  • Page 3 MANUFACTURING PROCESS INSTRUCTIONS MECHANICAL ASSEMBLY MODEL : Hawking Hawking LCM 拆机 SOP Sub-assembly name: Hawking LCM 拆机 SOP Document No.: 杨金波 Written by: Revision: 1.00 Date: 2020/1/8 Page: 1 of 15 A.Current station version list: Station VersionStation VersionStation VersionStation VersionStation V ersion Station Version 1.00 1.00...
  • Page 4 Operation Procedure 1(1/1) Station: Document No. : Hawking LCM Disassembly SOP 2018/03/12 1.00 Work Name Ver. : Date Disassemble Hinge cover Step: 1. Press down Hinge cover. Attention︰if an exception occurs, please contact foreman or assistant immediately. Fixture List(Fixture Specification) Fixture List(Fixture Specification) Auditor:...
  • Page 5 Operation Procedure 2(1/1) Station: Document No. : Hawking LCM Disassembly SOP 2018/03/12 1.00 Work Name Ver. : Date Disassemble Bezel Step: 1. First disassemble the left Bezel and pull it inward to disassemble. 2. Follow pic as below 1→ 2→3 →4 ❖...
  • Page 6 Operation Procedure 3(1/1) Station: Document No. : Hawking LCM Disassembly SOP 2018/03/12 1.00 Work Name Ver. : Date Disassemble LCD Step: 1: Remove the Bonding at bottom left and right with tweezers and pull down to separate the bonding from the LCD Attention︰if an exception occurs, please contact foreman or assistant immediately.
  • Page 7 Operation Procedure 4(1/1) Station: Document No. : Hawking LCM Disassembly SOP 2018/03/12 1.00 Work Name Ver. : Date Disassemble LCD Step: 1. Return LCD over back,pull out off EDP cable CNTR 2. Need recycle LCD, Put LCD carefully in box Attention︰if an exception occurs, please contact foreman or assistant immediately.
  • Page 8 Operation Procedure 5(1/2) Station: Document No. : Hawking LCM Disassembly SOP 2018/03/12 1.00 Work Name Ver. : Date Disassemble Hinge Step: 1. Remove screws of left and right on hinge M2.5x2.5(6052A0047401)*6. ❖ Screwdriver N0 #1 ❖ Torsion:2.5± 0.3 Kg/cm 2. Disassemble hinge need recycle Attention︰if an exception occurs, please contact foreman or assistant immediately.
  • Page 9 Operation Procedure 5(2/2) Station: Document No. : Hawking LCM Disassembly SOP 2018/03/12 1.00 Work Name Ver. : Date Disassemble Hinge Step: 1. Disassemble left and right Hinges need to be recycled. Attention︰if an exception occurs, please contact foreman or assistant immediately. Fixture List(Fixture Specification) Fixture List(Fixture Specification) Auditor:...
  • Page 10 Operation Procedure Important Station: 6(1/2) Document No. : Hawking LCM Disassembly SOP 0.30 2019/12/15 Work Name Ver. : Date Disassemble downside of WLAN AUX Step: 1.Disassemble wlan from left to right side, as shown in the picture. PIC 1 PIC 2 PIC 3 Attention︰if an exception occurs, please contact foreman or assistant immediately.
  • Page 11 Operation Procedure Important Station: 7(1/1) Document No. : Hawking LCM Disassembly SOP 0.30 2019/12/15 Work Name Disassemble downside of WWAN AUX Ver. : Date Step: 1. Disassemble the wwan from right to left side, as shown in the pictures. PIC 1 PIC 2 PIC 3 Attention︰if an exception occurs, please contact foreman or assistant immediately.
  • Page 12 Operation Procedure Important Station: 8(1/1) Document No. : Hawking LCM Disassembly SOP 0.30 2019/12/15 Work Name Disassemble left attenna Ver. : Date Step: 1.Disassemble left attenna by the way marked in picture. PIC 1 PIC 2 Attention︰if an exception occurs, please contact foreman or assistant immediately. Fixture List(Fixture Specification) Fixture List(Fixture Specification) Wlan-tidy Bar...
  • Page 13 Operation Procedure Important Station: 9(1/1) Document No. : Hawking LCM Disassembly SOP 0.30 2019/12/15 Work Name Disassemble left attenna Ver. : Date Step: 1. Bend copper foil of WWAN and WLAN away from cover. PIC 1 Attention︰if an exception occurs, please contact foreman or assistant immediately. Fixture List(Fixture Specification) Fixture List(Fixture Specification) Wlan-tidy Bar...
  • Page 14 Operation Procedure Important Station: 10(1/1) Document No. : Hawking LCM Disassembly SOP 0.30 2019/12/15 Work Name Ver. : Date Disassemble right side attenna Step: 1.Disassemble right side attenna by the way marked in the pictures. PIC 1 PIC 2 Attention︰if an exception occurs, please contact foreman or assistant immediately. Fixture List(Fixture Specification) Fixture List(Fixture Specification) Wlan-tidy Bar...
  • Page 15 Operation Procedure Important Station: 11(1/1) Document No. : Hawking LCM Disassembly SOP 0.30 2019/12/15 Work Name Ver. : Date Disassemble right side attenna Step: 1. Bend copper foil of WWAN and WLAN away from cover. PIC 1 Attention︰if an exception occurs, please contact foreman or assistant immediately. Fixture List(Fixture Specification) Fixture List(Fixture Specification) Wlan-tidy Bar...
  • Page 16 Operation Procedure Station: 12(1/1) Document No. : Hawking LCM Disassembly SOP 0.30 2019/12/15 Work Name Disassemble camera Ver. : Date Step: 1. Disassemble EDP cable by the way marked in pictures.. 2. Tear down camera gum, disassemble the camera for recycle. PIC 1 PIC 2 Attention︰if an exception occurs, please contact foreman or assistant immediately.
  • Page 17 Operation Procedure 13(1/1) Station: Document No. : Hawking LCM Disassembly SOP 2018/03/12 1.00 Work Name Ver. : Date Save A cover for recycle Step: 1. Save A cover in bag for recycle. Attention︰if an exception occurs, please contact foreman or assistant immediately. Fixture List(Fixture Specification) Fixture List(Fixture Specification) Auditor:...
  • Page 18 MANUFACTURING PROCESS INSTRUCTIONS MECHANICAL ASSEMBLY MODEL : Hawking Hawking FA 拆机 SOP Sub-assembly name: Hawking FA 拆机 SOP Document No.: 杨金波 Written by: Revision: 1.00 1 of 20 Date: 2019/1/6 Page: A.Current station version list: Station Version Station Version Station Version Station Version Station VersionStation Version 1.00 1.00...
  • Page 19 Standard Operation Process 1(1/1) Document No. : Hawking FA disassembly SOP Station: 2018/03/12 1.00 Process Name : Ver. : Date Dismantle Base Bottom rubber Step: 1. Get rubber*2 below marked as red Fixture list(fixture specifications) Fixture list(fixture specifications) Electric screwdriver Tabulator:...
  • Page 20 Standard Operation Process 2(1/1) Document No. : Hawking FA disassembly SOP Station: 2018/03/12 1.00 Process Name : Ver. : Date Dismantle Base Bottom Screws Step: 1. Get screws M2.5x4(6052B0424501Silver) *2.( number 1&2) ❖ Dismantle sequence 1 → 2 2. Get screwsM2.5x6 (6052A0029201)*4 : #1 ❖...
  • Page 21 Standard Operation Process 3(1/1) Document No. : Hawking FA disassembly SOP Station: 2018/03/12 1.00 Process Name : Ver. : Date Dismantle C top and Base Bottom Step: 1. Open the machine for about 60degrees and place it on the table vertically.
  • Page 22 Standard Operation Process 4(1/1) Document No. : Hawking FA disassembly SOP Station: 2018/03/12 1.00 Process Name : Ver. : Date Dismantle battery Step: 1. Get BATT Screws M2x3.5(6052A0051101))*4 ❖ screwdriver head ❖ Torque :1.5 ± 0.30 Kg/cm 2. Remove and recycle the battery Fixture list(fixture specifications) Fixture list(fixture specifications) Electric screwdriver...
  • Page 23 Standard Operation Process 5(1/1) Document No. : Hawking FA disassembly SOP Station: 2018/03/12 1.00 Process Name : Ver. : Date Dismantle DDR Step: 1.Remove DDR socket shrapnel at both ends,Remove and Recycle DDR. 2.Recycle hook(6051B1241101)) GOOD Fixture list(fixture specifications) Fixture list(fixture specifications) Tabulator:...
  • Page 24 Standard Operation Process 6(1/2) Document No. : Hawking FA disassembly SOP Station: 2018/03/12 1.00 Process Name : Ver. : Date Dismantle HDD Step: 1.Dismantle HDD FFC from the mainboard 2.Remove the HDD from C top Fixture list(fixture specifications) Fixture list(fixture specifications) Tabulator:...
  • Page 25 Standard Operation Process 6(2/2) Document No. : Hawking FA disassembly SOP Station: 2018/03/12 1.00 Dismantle HDD smart cover&HDD cable Process Name : Ver. : Date Step: 1.Dismantle HDD connecting line 2.Remove HDD smart cover 此处有刻MARK标记-14 NB Fixture list(fixture specifications) Fixture list(fixture specifications) Tabulator:...
  • Page 26 Standard Operation Process 7(1/2) Document No. : Hawking FA disassembly SOP Station: 2018/03/12 1.00 Process Name : Ver. : Date Dismantle Antenna port Step: 1. Dismantle Antenna port 2.Get SSD、wlan module screwsM2x3.5 (6052A0051101))*2 ❖ screwdriver head#1 ❖Torque:1.5± 0.30 Kgf.cm ❖Screws shall not slip or fall into the machine。...
  • Page 27 Standard Operation Process 7(2/2) Document No. : Hawking FA disassembly SOP Station: 2018/03/12 1.00 Process Name : Ver. : Date Dismantle USB/B FFC,remove antenna Step: 1. Dismantle USB/B FFC,pull out FFC 2.Dismantle Antenna cable 圖二 Fixture list(fixture specifications) Fixture list(fixture specifications) Tabulator:...
  • Page 28 Standard Operation Process 8(1/1) Document No. : Hawking FA disassembly SOP Station: 2019/11/2 0.20 Process Name : Ver. : Date Disassembly WWAN Step: 1. Pull out WWAN antenna. (Pic 1) ❖ The number of antenna number 5 to 5, 6 to 6 2.
  • Page 29 Standard Operation Process 9(1/1) Document No. : Hawking FA disassembly SOP Station: 2018/03/12 1.00 Process Name : Ver. : Date Disassembly SPK Step: Speaker 1. Pull out SPK CNTR from MB. 6039B0093001 2. Recycle SPK. 6039B0092901 6039B0093201 Fixture list(fixture specifications) Fixture list(fixture specifications) Tabulator:...
  • Page 30 Standard Operation Process 10(1/2) Document No. : Hawking FA disassembly SOP Station: 2018/03/12 1.00 Process Name : Ver. : Date Disassmble Edp cable/FFC Step: 1.Disassemble Edp cable , pull the belt of cable from CNTR 2.Disassemble TH pad board FFC ❖...
  • Page 31 Standard Operation Process 10(2/2) Document No. : Hawking FA disassembly SOP Station: 2018/03/12 1.00 Process Name : Ver. : Date Catch hinge up screw Step: 1.Catch Hinge UP, disassemble hinge screw M2.5x6(6052A0029201)*4.5 2.Disassemble Hinge screw with MBM2X3.5( 6052A0051101) ❖ Torque :3.0 ± 0.3 Kgf.cm ❖...
  • Page 32 Standard Operation Process 11(1/1) Document No. : Hawking FA disassembly SOP Station: 2018/03/12 1.00 Process Name : Ver. : Date Catch Hinge UP Step: 1.Open machine with the angle then close , make hinge desperate with top. 2. Get TOP from upside Fixture list(fixture specifications) Fixture list(fixture specifications) Tabulator:...
  • Page 33 Standard Operation Process 12(1/2) Document No. : Hawking FA disassembly SOP Station: 2018/03/12 1.00 Process Name : 取KB FPC/DC-IN Cable Ver. : Date Step: 1.Open the KB connecter cover,pull out KB FPC. (for backlight SKU: pull out backlight wire) 2.Disassemble DC-IN cable. Pull out DC- IN head with upper right, can’t pull with straight Hook...
  • Page 34 Standard Operation Process 12(2/2) Document No. : Hawking FA disassembly SOP Station: 2018/03/12 1.00 Process Name : 取DC-IN CNTR&Fan CNTR Ver. : Date Step: 1.Pull out the DC cable from DC-IN CNTR, 2.Pull out Fan wire from CNTR. Fixture list(fixture specifications) Fixture list(fixture specifications) Tabulator:...
  • Page 35 Standard Operation Process 13(1/1) Document No. : Hawking FA disassembly SOP Station: 2018/03/12 1.00 Process Name : Ver. : Date Dismente FAN and Thermal Step: 1.Disassemble Fan’s screw M2x3.5(6052A0051101)*4.recycle FAN 2.Disassemble screw of thermal as below picture show M2x3.5(6052A0051101)*2 ❖ Screwdriver bit : #1 ❖...
  • Page 36 Standard Operation Process 14(1/2) Document No. : Hawking FA disassembly SOP Station: 2018/03/12 1.00 Process Name : Ver. : Date Disassemble MB Step: 1.Disassemble the screw of MB M2x2 (6052B0156201)*3,Follow order 1-3. 2.Disassemble the screw of MB M2x3.5(6052A0051101)*1, number 4 ❖...
  • Page 37 Standard Operation Process 14(2/2) Document No. : Hawking FA disassembly SOP Station: 2018/03/12 1.00 Process Name : Ver. : Date Disassemble MB Step: 1.Lift the MB,take out the MB from housing. 2.Recycle card reader FFC 3.Put MB into the bag. Fixture list(fixture specifications) Fixture list(fixture specifications) Tabulator:...

Table of Contents