Check The Mast For Proper Sequencing; Inspect The Casters And Wheels - Genie SUPERLIFT Contractor SLC-6 Parts & Service Manual

Table of Contents

Advertisement

Section 4 - Scheduled Maintenance Procedures
TABLE A
PROCEDURES
A-7
Check the Mast for Proper
Sequencing
Detection of damage to the mast is essential for
safe machine operation. An unsafe working
condition exists if the mast is damaged and does
not sequence properly, free of hesitation and
binding. A daily check of the sequencing allows
the inspector to identify changes in the operating
condition of the mast assembly that might indicate
damage.
1 Raise all columns to full height with no load on
the load handling attachment.
0 Result: The carriage should rise to the top of
the front column section, followed in
consecutive order by each column.
2 Lower the columns to the stowed position.
0 Result: The columns should lower in reverse
order, followed by the carriage.
Parts and Service Manual- First Edition
A-8
Inspect the Casters and Wheels
Extremely dirty conditions may require that the
casters and wheels be inspected and lubricated
more often.
1 Visually inspect each caster and wheel for cuts,
cracks or unusual wear.
2 Move the machine on a flat smooth surface and
check that the casters and wheels roll
smoothly, free of hesitation and binding.
3 Lock the base swivel casters.
0 Result: The wheels should not roll.
4-4
Genie Superlift Contractor
Part No. 33953

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents