Vertical Shaft Bushing Installation; Vertical Shaft Bushing Inspection - Honda BF2D Series Manual

Table of Contents

Advertisement

HONDA
BFBD
VERTICAL SHAFT BUSHING INSTALLATION
1
[ I
I
INCORRECT
1) Clean and decrease the extension case installation part
and the outer surface of the busing.
2) Apply water to the outer surface of the bushing, and push
the bushing into the extension case from the bottom until
it stops.
3) Be sure that the bushing is not inclined and is not offset
but is set properly.
4) Apply marine grease to the vertical shaft bushing.
c. INSPECTION
VERTICAL SHAFT BUSHING I.D.
VERTICAL SHAFT-TO-BUSHING CLEARANCE
Standard
11.15- 11.20 mm
(0.439
-
0.441 in)
I
Standard
1
Service limit
I
Service limit
11.70 mm
(0.461 in)
r
0.16
-
0.23 mm
(0.006
-
0.009 in)
BUSHING
35
Â
1 mm (1.38
0.04 in)
14-3
Page: 70 - Honda BF2D Outboard Motors Shop Manual -
http://www.ReadManuals.Com

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents