Husqvarna 525HE3 Workshop Manual page 21

Hide thumbs Also See for 525HE3:
Table of Contents

Advertisement

5. Remove the 4 screws (F).
J
H
F
6. Remove the metering cover (G), the metering
diaphragm (H) and the metering gasket (I).
7. Remove the screw (J) .
8. Remove the metering lever (K), the needle valve (L),
the metering lever pin (M), and the metering lever
spring (N).
9. Examine the metering lever and the needle valve for
wear and damages. Replace the needle valve and
metering lever if it is necessary.
1371 - 001 - 02.07.2020
10. Remove the screw (O) and the throttle valve plate
N
M
K
L
I
11. Remove the screw (Q) and the throttle lever (R).
G
12. Remove the E-clip (S) and the throttle shaft
13. Remove the screw (V) and the choke valve plate
14. Put your thumb against the hole (X) for the choke
(P).
O
P
S
R
Q
assembly (T) together with the throttle return spring
(U).
(W).
Y
friction ball and carefully pull out the choke shaft (Y).
Note: The spring (Z) and the friction ball (AA) eject
when you pull out the choke shaft.
T
U
X
Z
AA
W
V
Repair instructions - 21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

525he4

Table of Contents