MAINTENANCE
5. PUMP
ONLY QUALIFIED MAINTENANCE
PERSONNEL ARE TO PERFORM THE
FOLLOWING REPAIRS.
SOLUTION PUMP REPLACEMENT
1. Turn off all switches and unplug machine.
2. Tilt machine back so bottom is exposed.
3. Remove the 6 screws that fasten the frame
to the solution tank.
4. Remove the solution hoses from the fittings
on the pump.
5. Reverse process to install.
PUMP REPLACEMENT KITS
4-4
6. REGULATING UNLOADER
ONLY QUALIFIED MAINTENANCE
PERSONNEL ARE TO PERFORM THE
FOLLOWING REPAIRS.
UNLOADER REPLACEMENT
1. Turn off all switches and unplug machine.
2. Tilt machine back so bottom is exposed.
3. Remove the 6 screws that fasten the frame
4. Remove the solution hoses from the fittings
5. Remove the unloader.
6. Reverse process to install.
CAM & BEARING
86311080 120V
86305510 230V
PLUNGER & SEALS KIT
86201080
PRV NO. 250-25A
CMPS2 86305210 04/23/08
to the solution tank.
on the pump.
VALVE & O-RING KIT
(BOTH SIDES)
86201030
PRV NO. 250-73B