Download Print this page

Prepare The Installation Location - Kohler K-3900X-2 Installation Manual

Integrated toilet
Hide thumbs Also See for K-3900X-2:

Advertisement

Available languages

Available languages

Tape

Prepare the Installation Location

IMPORTANT! Risk of product damage. If there are T-bolts extending from the flange, remove them. T-bolts
are not required for this installation.
IMPORTANT! Because of the unique design of this toilet, the width of the bottom edges of the toilet will vary.
The following steps are required because of this variation.
Cut out the inside of the flange area on the template along the dotted line.
¨
Position the template with the hole positioned over the flange. It is critical that the centerlines marked on the
¨
template are centered on the flange.
Secure the template to the floor with tape.
¨
Confirm the template is correctly positioned and centered over the flange.
¨
Position the toilet on the template. Make sure the front of the base of the toilet is aligned with the markings
¨
on the template.
Confirm the left/right position of the toilet left or right so that an equal amount of shaded area is visible
¨
on each side of the template.
Directly under the screw holes on each side of the toilet, accurately mark the bottom edge of the base.
¨
The mark should intersect the lines labeled "C" and "A" or "B" on each side of the template.
1195109-X2-A
Flange Centerlines
Flange
Template
8
Screw Hole
Center the toilet
on the template.
Top View
Kohler Co.

Advertisement

loading

This manual is also suitable for:

K-3900x