Download Print this page

Prepare The Installation Location - Kohler K-3900T-2 Installation Manual

Integrated toilet
Hide thumbs Also See for K-3900T-2:

Advertisement

For Through-
the-Floor
Supplies Only
Tape

Prepare the Installation Location

IMPORTANT! Risk of product damage. If there are T-bolts extending from the flange, remove them. T-bolts
are not required for this installation.
IMPORTANT! Because of the unique design of this toilet, the width of the bottom edges of the toilet will
vary. The following steps are required because of this variation.
Cut out the inside of the flange area on the template along the dotted line.
Position the template with the hole positioned over the flange. It is critical that the centerlines
marked on the template are centered on the flange.
Secure the template to the floor with tape.
Confirm the front position of the toilet on the template. Make sure the front of the base of the toilet is aligned
with the markings on the template.
Confirm the left/right position of the toilet left or right so that an equal amount of shaded area is visible on each
side of the template.
Directly under the screw holes on each side of the toilet, accurately mark the bottom edge of the
base. The mark should intersect the lines labeled "C" and "A " or "B" on each side of the template.
Kohler Co.
For Wall Supply
Installations Only
Flange Centerlines
Template
Screw Hole
Center the toilet
on the template.
Flange
Top View
11
1195109-T01-A

Advertisement

loading