Download Print this page

Kohler K-3900X-2 Installation Manual page 11

Integrated toilet
Hide thumbs Also See for K-3900X-2:

Advertisement

Available languages

Available languages

Install Mounting Blocks and Wax Ring
Position the mounting blocks over the mounting holes.
¨
Secure each of the mounting blocks with two of the supplied lag bolts.
¨
Position a wax ring on the flange.
¨
Connect the Supply Hose to the Toilet
Slide the supply hose outlet into the toilet water inlet.
¨
Slide the clip over the flanges on the supply hose and inlet. Make sure both flanges rest in the gap in the clip
¨
and are firmly held in place.
CAUTION: Risk of property damage. It is critical that the supply hose be firmly secured by the clip.
The supply hose could be displaced when under pressure if the clip is not correctly installed, resulting in
water damage.
IMPORTANT! Confirm the clip is firmly holding the supply hose in place. The clip will be able to rotate freely
with no significant resistance when properly installed.
Kohler Co.
Flanges
Clip
Wax
Lag Bolt
Ring
11
Hose Should Face
Down When Through
Floor
Supply
Hose
1195109-X2-A

Advertisement

loading

This manual is also suitable for:

K-3900x