Draining - A.O. Smith ITES Series Installation, User And Service Manual

Glass-lined industrial solar/electric water heater
Table of Contents

Advertisement

Available languages

Available languages

5
Legend
Unused numbers are not
applicable.
1. pressure reducing valve
(mandatory if the mains
water pressure is too
high)
2. inlet security group
(mandatory)
3. T&P valve (mandatory -
factory delivered)
4. stop valve
(recommended)
5. non-return valve
(mandatory)
6. circulation pump
(optional)
9. drain valve
11. service stop valve
(recommended)
12. temperature gauge
(recommended)
A. water supply
B. hot water supply
C. circulation pipe
0312809_ITES_NLEN_V0.0, 08-11-2019

Draining

Installation diagram
Some service activities require the water heater to be drained. The procedure is as
follows:
1. Switch the water heater OFF by using the ON/OFF switches of the electrical
elements and main switch on the control unit.
2. Isolate the water heater from the power supply by setting the isolator between the
water heater and the mains power supply to position 0.
3. Close the stop valve (11) in the hot water pipe.
4. Close supply valve in the cold water inlet (A).
5. Open drain valve (9).
6.
Bleed the water heater (or installation) so that it drains completely.
IMD-1382 R0.0
75

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Ites 1000Ites 1500Ites 2000Ites 2500Ites 3000

Table of Contents