Filling - A.O. Smith ITES Series Installation, User And Service Manual

Glass-lined industrial solar/electric water heater
Table of Contents

Advertisement

Available languages

Available languages

4
Legend
Unused numbers are not
applicable.
1. pressure reducing valve
(mandatory if the mains
water pressure is too
high)
2. inlet security group
(mandatory)
3. T&P valve (mandatory -
factory delivered)
4. stop valve
(recommended)
5. non-return valve
(mandatory)
6. circulation pump
(optional)
9. drain valve
11. service stop valve
(recommended)
12. temperature gauge
(recommended)
A. water supply
B. hot water supply
C. circulation pipe
0312809_ITES_NLEN_V0.0, 08-11-2019

Filling

Installation diagram
To fill the water heater, proceed as follows:
1. Open the stop valve (11) in the hot water pipe and, if present, the stop valves (4) for
the circulation pump (6).
2. Close the drain valve (9).
3. Open the nearest hot water draw-off point (14)
4. Open the inlet valve of the inlet security group (2) so that the cold water flows into the
water heater.
5. Completely fill the water heater. When a full water jet flows from the nearest draw-off
point, the water heater is full.
6. Bleed the entire installation of air, for example by opening all draw-off points.
7. The water heater is now under water supply pressure. There should now be no water
coming out of the inlet security group or out of the T&P valve (3). If there is, the
cause might be:
-
The water supply pressure is greater than the specified value (3.3.2 "General
specifications").
-
Rectify the by fitting a pressure reducing valve.
-
The expansion valve in the protected cold water supply set-up is defective or
incorrectly fitted.
-
The T&P valve is defective or incorrectly fitted.
IMD-1382 R0.0
73

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Ites 1000Ites 1500Ites 2000Ites 2500Ites 3000

Table of Contents