Weider WESY2966.0 User Manual page 10

Resistance system
Table of Contents

Advertisement

11. Route the Long Cable (42) under a 90mm
Pulley (38). Attach the Pulley, a Cable Trap
(39), and two Half Guards (37) to the indicated
hole in the Base (2) (see the inset drawing) with
an M10 x 52mm patch Screw (76) and an M10
Washer (59). Make sure that the Cable Trap
is oriented to hold the Cable in the groove
of the Pulley.
12. Attach a Pulley Bracket (17) to the indicated
"U"-channel (18) with an M10 x 132mm Button
Bolt (72), two M10 Washers (59), and an M10
Nylon Locknut (56).
Wrap the Long Cable (42) over a 90mm Pulley
(38). Attach the Pulley inside the Pulley Bracket
(17) with an M10 x 42mm Button Bolt (71) and
an M10 Nylon Locknut (56).
13. Wrap the Long Cable (42) under a 90mm
Pulley (38). Attach the Pulley, a Cable Trap
(39), and two Half Guards (37) to the Base (2)
with an M10 x 52mm Patch Screw (89) and an
M10 Washer (59). Make sure that the Cable
Trap is oriented to hold the Cable in the
groove of the Pulley.
Note: The Half Guards (37) attached in this
step will overlap the Half Guards attached in
steps 8 and 11.
11
42
38
37
39
Hole
2
12
72
59
71
38
13
42
37
10
37
89
59
2
18
59
17
56
56
42
89
37
59
38
39
2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Max

Table of Contents