Ac Power; Fluid Outlet Line - Graco SaniForce SDU Series Manual

Drum unloader
Hide thumbs Also See for SaniForce SDU Series:
Table of Contents

Advertisement

Installation

AC Power

Power
AC
AC
Power
NOTICE
NOTICE
NOTICE
Branch circuit protection and power disconnect to
be provided by the installer per local code.
AC power is required for an unloader with an
electro-pneumatic control panel.
1. Route wires to control panel through electrical
conduit. Attach conduit using hole on bottom
right hand side of enclosure with a type 4X rated
conduit hub.
2. Attach the power system ground wire to the
chassis ground lug (as shown) with 14 AWG
stranded copper wire. Torque to 35 in-lbs (3.95
N•m).
14
3. Connect equipment to 100 – 240 VAC, single
phase, 50/60 Hz, 15 A service with 14 AWG
stranded copper wire. Attach to L1 and L2 on
power switch as shown. Torque to 8 in-lbs (0.9
N•m).
Fluid Outlet
Fluid
Fluid
Outlet Line
Outlet
Line
Line
Connect a grounded, flexible fluid hose (S) to the fluid
outlet port. The port is 2.0 in (50.8 mm) tri-clamp.
3A5402J

Advertisement

Table of Contents
loading

This manual is also suitable for:

Saniforce sdu a01aaa1aa0c21

Table of Contents