Heat & Glo COSMO32-IFT-B Installation Manual page 63

Table of Contents

Advertisement

Finishing Material Installed with Passive Heat Optional Heat Management System
OPEN TOP DISCHARGE
*
2 IN. MIN.
DO NOT INSTALL
FINISHING MATERIAL
ON THIS SURFACE.
2 IN. MIN. OPENING
MUST NOT BE
BLOCKED
*
= Mesh screen required for front discharge or open top discharge passive heat installations with
discharge opening of 3 inches or greater.
Figure 10.8 Finishing Material installed with Passive Heat Optional Heat Management System
Heat & Glo • COSMO32-IFT-B, COSMO36-IFT-B, COSMO42-IFT-B Installation Manual • 2619-980 Rev. G • 7/20
DO NOT INSTALL
FINISHING MATERIAL
ON THIS SURFACE.
2 IN. MIN. OPENING
MUST NOT BE
BLOCKED
SIDE DISCHARGE
(DISCHARGE SLOTS ON BOTH SIDES OF APPLIANCE)
FRONT DISCHARGE
*
2 IN. MIN.
8-3/4 IN.
12-1/4 IN.
63

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cosmo36-ift-bCosmo42-ift-b

Table of Contents