Sp5 Internal Models - 100Mm Non-Corrosive Metal Flue; Sp6 Internal Models - 100Mm Drainage Waste Vent (Dwv) Flue - Rinnai Brivis StarPro SP5 Series Installation Manual

Ducted gas heater
Table of Contents

Advertisement

4.5.2 SP5 Internal Models – 100mm non-corrosive metal flue.
Requires a 100mm round single or twin wall non-corrosive metal flue, suitably terminated.
All flues shall have a bolted flue sleeve connection to allow for repairs and/or removal of the appliance.
Twin Wall flue – maximum flue length of 6m.
Single Wall flue – maximum flue length of 2m.
Up to four 90º elbows are permitted with the same length requirements specified above.
4.5.3 SP6 Internal Models – 100mm Drainage Waste Vent (DWV) flue
All SP6 internal model heaters are supplied with an Level Invert Taper (LIT) fitting and flue connection to unit is with
100mm Drain Waste Vent pipe (DWV to AS/NZS 1260).
Flue shall be installed in accordance with the following:
Exit heater with a minimum 300mm straight run of 100mm DWV flue before the first elbow.
All flue joints shall be adequately sealed to prevent condensate leakage.
Ensure there is continual fall back to the flue outlet on the heater from flue termination point.
Flue shall be removable from the heater to allow for repairs and/or removal of the appliance.
Flat side of the LIT (not tapered side) must be positioned so it is always the lowest part of the fitting or the
closest point to ground.
Note: If a lay-down kit is used, the LIT must be rotated to ensure the flat side of LIT fitting is closest to ground (Diagram 5).
Diagram 5. LIT Orientation for Lay-down Installations
Standard Installation
Correct: LIT at Lowest Point
A maximum length of 25m x 100mm DWV flue pipe is allowed in all situations with no more than four 90º bends.
Refer to Table 4.
Table 4. Maximum Flue Bends and Terminals
All Internal SP6 Models
Heater Orientation
Standard
Lay-down
Note: One 45º bend is equivalent to one half 90º bend and all vertical flue orientations will have at least one 90º bend.
Brivis
Flue Orientation
Vertical
Horizontal
Vertical
Horizontal
Lay-down Installation
Correct: LIT Rotated
100mm DWV Flue
90º Bends
(Up to 4)
25m
100mm DWV Plain Vent Cowl
25m
Remote Flue Terminal
25m
100mm DWV Plain Vent Cowl
25m
Remote Flue Terminal
15
Incorrect: LIT Not Rotated
Terminal Type
Ducted Gas Heater IM

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents