4
Installation requirements
4.1
Installation Sites
Comply with the valid national regulations for installation sites and electrical connections. Ventilation of the
installation sites must be appropriate for device output. Inadequate ventilation of the device will result in its
overheating and being destroyed. Always make certain that no intake or discharge vents are covered.
4.2
Electrical Connections
A socket outlet with an earthed contact featuring a maximum protection of 16 amperes is required.
The line voltage must always be within following tolerances: 220 VAC +6%/-10% / 60 Hz
Cornelius Deutschland GmbH
Document no: TD1005601EN
Version A, 24.09.2019, Index 0
Energize R134a 60Hz
Manual operation undercounter cooler
Energize R134a 60Hz
Page 10