Installation

The device must be installed by a trained service technician. Please take care, that the socket for the unit is
always accessible.
There are no user serviceable items inside the equipment.
If the power supply cable to the unit is damaged, it has to be replaced by the manufacturer, the service
partner or any other qualified person to avoid safety hazard.
The unit must be planar aligned. Max angle of +/- 2° is permitted.
5.1

Water Connection

Connecting only to drinkable water!
Connect the device to a feed line with an inner diameter of 10 mm. We recommend using a water filter and a
water pressure regulator for the water input. To permit flushing of the filter, a t-piece should be mounted
downstream of the water pressure regulator. The water flow pressure must be minimum 2 bar (mount control
pressure gauge on water pressure regulator).
5.2
CO
-Connection
2
You will require minimum a stage-wire pressure regulator with 0.7 MPa (7 bar). Using tubing with an inner
diameter of 4mm, connect the pressure regulator to the carbonator. Set the CO
The unit includes a CO
-pressure switch to switch off the dispensing valves at a CO
2
Mpa (4 bar).
The second connector is used for feeding the Syrup container in order to deliver the Syrup to tower. If Light
Syrups are being used, a secondary Pressure regulator set to 0.05 Mpa –0.1 Mpa (0.5 bar-1.0 bar) is
needed.
5.3

Connecting Premix and Postmix Syrup

Connect one tube with an inner diameter of 6 mm to each device connection. Connect the tube end to the
correct cooling coil inputs of the cooler circuit carbonator.
5.3.1

Connecting Premix and Postmix Syrup to Energize Cooler

As Energize in basic specification (without Energize Tower) the cooler will be connected to the syrup
container directly by a tube ID 8.0mm (Premix) or tube ID 6.0mm (Postmix).
5.3.2

Connecting Premix and Postmix Syrup to Energize Tower

With connected Energize Tower the syrup container will be connected directly to the Tower connectors by a
tube ID 8.0mm (Premix) or tube ID 6.0mm (Postmix).
5.4

Connecting Soda Water and Still Water

Connect the soda water to the forward and backward fittings at the Energize. The inside diameter of the
tubes should be 13 mm.
The still water has to be connected to the still water outlet of the Energize. The flow pressure is adjusted to
0.32 Mpa (3.2 bar). If necessary, it can be adapted to the local requirements.
5.5

Power Supply of the Electric Valves

Energize units are equipped with a transformer (not in basic specification) with 24 Volts for the electric power
supply of the valves in the tower.
For the power supply of the valves these are connected to the connecting bus (see wiring diagram) at the
Energizes inner panel according to the circuit diagram.
Cornelius Deutschland GmbH
Document no: TD1005601EN
Version A, 24.09.2019, Index 0
Energize R134a 60Hz
-pressure to 0.6 Mpa (6 bar).
2
-pressure less than 0.4
2
Manual operation undercounter cooler
Energize R134a 60Hz
Page 11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Energize 3Energize 4Energize 5

Table of Contents