Install Kick Strip; Clean-Up After Installation - Kohler Precedence K-1353-AA Installation Instructions Manual

Baths
Table of Contents

Advertisement

13. INSTALL KICK STRIP

NOTE: Install kick strip after the finished flooring is
installed.
With the paper backing still attached, place the kick strip
along the outline of the bath base.
Begin at one end and peel back a few inches of the paper
backing from the kick strip.
Align end of kick strip to finished wall and bottom of bath
base. Lightly press kick strip to bath base.
Peeling back a few inches of paper backing at a time,
continue aligning and pressing kick strip to bath base.
After kick strip is completely applied, go over its entire
length with firm pressure to secure kick strip to bath
base.

14. CLEAN-UP AFTER INSTALLATION

Do not use abrasive cleaners as they may scratch and
dull the unit surface. Use warm water and a liquid
detergent to clean the surface. See the owner's manual
for additional information on cleaning.
Stubborn stains, paint, or tar on the remainder of the
bath (not door and seat) can be removed with turpentine
or paint thinner. Do not allow cleaners containing
petroleum distillates to remain in contact with bath
surfaces for long periods of time. Plaster can be
removed by scraping with a wood edge. Do not use
metal scrapers, wire brushes, or other metal tools. One
of the powder-type detergents may be used on a damp
cloth to provide mild abrasive action to the residual
plaster.
CA
113019-
(1093)
Kick strip
Polystyrene
14
FRP Acrylic
Polystyrene
Kohler Co., Kohler WI

Advertisement

Table of Contents
loading

This manual is also suitable for:

Precedence k-1354-aa

Table of Contents