Index
1. Information
2. Preparing for installation
3. Installation sequence
4. Commissioning, inspec-
tion, maintenance
5. Maintenance
Disposal of packaging ............................................................................
Symbols .................................................................................................
Intended use ..........................................................................................
Product information ................................................................................
System examples ...............................................................................
■
Spare parts lists ..................................................................................
■
Requirements concerning on-site connections ...................................... 10
Siting and transport requirements .......................................................... 10
Transport ............................................................................................ 10
■
Installation room requirements ........................................................... 11
■
Siting the heat pump .............................................................................. 13
Removing the front panel ................................................................... 13
■
Removing the heat pump module ....................................................... 14
■
Transporting the heat pump module ................................................... 17
■
Installing the heat pump module ......................................................... 17
■
Levelling the heat pump ..................................................................... 18
■
Hydraulic connections ............................................................................ 18
Connecting the primary/secondary circuits ......................................... 18
■
Connecting the cooling circuit ............................................................. 20
■
Electrical connection .............................................................................. 20
Preparing the electrical connections ................................................... 20
■
Opening the wiring chamber ............................................................... 22
■
Installing the programming unit .......................................................... 23
■
Routing the cables to the wiring chamber .......................................... 25
■
Connecting the Vitoconnect (accessories) ......................................... 27
■
Overview of electrical connections ..................................................... 28
■
Main PCB (230 V~ function components) .......................................... 29
■
Expansion PCB on main PCB (230 V~ components) ......................... 31
■
Luster terminals (message and safety connections) .......................... 34
■
Controller and sensor PCB (extra low voltage (ELV) connections) .... 36
■
Connecting a temperature limiter to restrict the maximum tempera-
■
ture of underfloor heating circuit ......................................................... 37
Swimming pool heating ...................................................................... 40
■
Power supply ......................................................................................... 41
Heat pump control unit power supply 230 V~ ..................................... 42
■
Compressor power supply 230 V~ ..................................................... 42
■
Compressor power supply 400 V~ ..................................................... 43
■
Instantaneous heating water heater power supply 230 V~ ................. 43
■
Instantaneous heating water heater power supply 400 V~ ................. 43
■
Power supply with power-OFF, 400 V appliances: Without on-site
■
load disconnect ................................................................................... 44
Power supply with power-OFF, 230 V appliances: Without on-site
■
load disconnect ................................................................................... 44
Power supply with power-OFF, 400 V appliances: With on-site load
■
disconnect .......................................................................................... 45
Power supply with power-OFF, 230 V appliances: With on-site load
■
disconnect .......................................................................................... 46
Mains power supply in conjunction with on-site power consumption . 48
■
Smart Grid .......................................................................................... 48
■
Make connections at terminals X3.8/X3.9 ............................................. 50
Closing the heat pump ........................................................................... 50
Steps - commissioning, inspection and maintenance ............................ 51
Opening the casing door ........................................................................ 69
Overview of electrical components ........................................................ 69
400 V appliances ................................................................................ 69
■
Index
7
7
7
8
8
9
5