5.3

Connecting the projector with the power net

W
ARNING
ble disconnect switch, circuit breakers and ground fault current interrupters. The installation shall be done
according to the local electrical installation codes.
C
AUTION
located in a sealed compartment behind the rear cover of the projector.
C
AUTION
(12AWG).
Necessary tools
Medium size flat screw driver (4mm x 100mm).
Torque flat screw driver (medium size).
Large size flat screw driver (8mm x 150mm).
24mm open end wrench.
Necessary parts
Certified AC power supply cord 2.5mm
diameter from 8 to 13mm.
How to connect the main AC power with the DP2K-S series projector projector?
1. Remove the rear cover of the projector. See procedure "Removal of the rear cover", page 119.
2. Remove the cover of the main AC compartment by releasing the two captive thumb screws (reference 1 image 5-6) .
Image 5-6
3. Guide the AC power supply cord (reference 2 image 5-7) through the cable gland (reference 3 image 5-7) and connect the wires
to the 3-terminal strip (reference 6 image 5-7) as illustrated. Use a torque screw driver to fasten the screws of the 3-terminal strip
with a torque of 1.7Nm (1.25 lbf*ft).
Warning:
Connect first the PE wire (reference 4 image 5-7), then the other wires (reference 5 image 5-7).
Tip:
Check for good fixation by pulling on each wire.
R5977692 DP2K-S SERIES 10/12/2012
:
The total electrical installation should be protected by an appropriate rated and readily accessi-
:
ALL POWER CONNECTIONS to the DP2K-S series projector are made to the 3-slot terminal block
:
The cross-sectional area of the conductors in the Power Supply Cord shall be not less than 2.5mm
(12AWG), min. 300V. Take into account that the cable gland of the projector allows a cable
2
5. Physical installation
1
2
25