Oven Assembly - Blodgett MT1820E Installation Operating & Maintenance Manual

Blodgett mt1820e conveyor oven installation -- operation -- maintenance
Hide thumbs Also See for MT1820E:
Table of Contents

Advertisement

Installation

Oven Assembly

LEGS
1. Lay the oven on it's back. Screw one leg into
each of the four holes located on the bottom
of the oven chamber.
2. Tighten the hex nut at the top of each leg.
3. Lift the oven upright onto the legs.
Figure 3
Bottom of
Oven
OVEN STAND WITH CASTERS
1. Attach each leg to the stand frame with a lock
washer and nut. DO NOT tighten completely.
2. Position the shelf between the legs with the
smooth surface facing the top of the stand.
Align the shelf with the holes in each leg. At-
tach the shelf to each leg with a nut and bolt.
3. Tighten the bolts installed in step 1.
4. Place the oven onto the stand. Bolt the oven
to the stand from underneath.
Leg
6
Stand
Top of
Frame
Stand
Shelf
Figure 4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents