Yamaha Z200N Service Manual page 311

Hide thumbs Also See for Z200N:
Table of Contents

Advertisement

BRKT
TILT RAM ASSEMBLY AND GEAR PUMP UNIT
7300
7310
7320
REMOVING THE TILT RAM END
SCREW
Loosen:
• Tilt ram end screw
End screw wrench
YB-06548 / 90890-06548
NOTE:
Hold the power trim and tilt unit in a vise
using aluminum plates on both sides.
REMOVING THE GEAR PUMP UNIT
Remove:
• Bolts 1
• Gear pump unit 2
• O-rings 3
• Check valve 4
NOTE:
Place a container under the power trim and
tilt unit.
DISASSEMBLING THE GEAR PUMP
UNIT
1. Remove:
• Bolts 1
• Pump gears 2
• Up-relief valve assembly 3
• Balls (4.76 mm/0.187 in) 4
• Shuttle valves 5
• Balls (3.18 mm/0.125 in) 6
NOTE:
When removing the pump gears, note their
original direction and position for proper
assembly.
7-32
E

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lz200nZ200yLz200y

Table of Contents