Unpacking The Quaternary Pump - Agilent Technologies 1100 Series Reference Manual

Quaternary pump
Hide thumbs Also See for 1100 Series:
Table of Contents

Advertisement

CA UT IO N
Table 2
Installing the Pump

Unpacking the Quaternary Pump

Unpacking the Quaternary Pump
Damaged Packaging
Upon receipt of your quaternary pump, inspect the shipping containers for
any signs of damage. If the containers or cushioning material are damaged,
save them until the contents have been checked for completeness and the
quaternary pump has been mechanically and electrically checked. If the
shipping container or cushioning material is damaged, notify the carrier and
save the shipping material for the carrier's inspection.
If there are signs of damage to the quaternary pump, please do not attempt to
install the quaternary pump.
Delivery Checklist
Ensure all parts and materials have been delivered with the quaternary pump.
The delivery checklist is shown in Table 2. To aid in parts identification,
please see Chapter 5 "Parts and Materials". Please report missing or damaged
parts to your local Agilent Technologies sales and service office.
Quaternary Pump Checklist
Description
Quaternary pump
Solvent cabinet
Solvent bottles
Bottle head assembly
Waste tube, purge valve
Vacuum degasser
Solvent tubes for the
degasser
Power cables
Quantity
1
1 (5062-8581)
4 (3 transparent 9301-1420, 1 amber 9301-1450)
4 (G1311-60003)
1 (5042-2461, reorder number, 5m)
1
4 (G1322-67300)
2
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents