Heat & Glo SL-3X-IFT Installation Manual page 28

Hide thumbs Also See for SL-3X-IFT:
Table of Contents

Advertisement

Top Vent - Vertical Termination - (continued)
Four 90º Elbows
Note: There MUST be a 25%
reduction in total H when
using flex vent except when
using the simple up and out
installation. See Figure 4.9.
Note: Use SLP Series
components only.
Figure 4.18
28
Heat & Glo • SL-3X-IFT, SL-5X-IFT, SL-7X-IFT, SL-9X-IFT Installation Manual • 2472-980 Rev. Q • 3/20
V
Min.
H
Max.
1
1
1-1/2 ft.
457 mm
4 ft.
1.2 m
V
+ V
+ V
1
2
V
3
H
2
H
1
V
1
ALL MODELS
V
Min.
H
Max.
2
2
4 ft.
1.2 m
4 ft.
H
+ H
Maximum= 40 ft. (12.2 m)
3 +
1
2
V
2
V
Min.
3
1.2 m 3-1/2 ft.
1.0 m

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl-5x-iftSl-5xlp-iftSl-7x-iftSl-7xlp-iftSl-9x-ift

Table of Contents