Connecting Power To The Branch Gateway - Avaya G450 Manual

Deploying and upgrading avaya g450 branch gateway
Hide thumbs Also See for G450:
Table of Contents

Advertisement

Installing the Branch Gateway

Connecting power to the Branch Gateway

About this task
After you have mounted the Branch Gateway, installed the PSU(s), installed the media modules,
and attached grounding conductors, you can connect power to the Branch Gateway. The Branch
Gateway can be ordered with either one or two power supply units.
Procedure
1. Connect the power cable to the power connector on the Branch Gateway back panel.
2. Plug the power cable into an AC outlet.
The Branch Gateway is now powered.
The PWR LED on the front panel lights. The CPU LED lights up if the firmware is running.
At least one LED on each media module, except the S8300D or S8300E server, lights up
initially and then goes off after about 20 seconds.
October 2019
Deploying and Upgrading Avaya G450 Branch Gateway
Comments on this document? infodev@avaya.com
40

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents