Test The Connection - Campbell CELL205 Product Manual

4g lte cellular module
Hide thumbs Also See for CELL205:
Table of Contents

Advertisement

3. Select the PakBusTcpServer in the Network Map. Select PakBus Port Always Open; the box
should have a check.
4. Select the data logger in the Network Map. Select Call-Back Enabled; the box should have
a check.

6.4.5.5 Test the connection

After the Network Map has been configured, test the cellular connection by using the Connect
screen as shown in the following image. Click on the appropriate station and click Connect to
initiate a call to the data logger.
TIP:
The connection time is subject to many external factors. It is often less than 30 seconds but
could be up to fifteen minutes. Be patient.