Singer SRP-50 Instruction Book page 46

Ribbing attachment
Table of Contents

Advertisement

(6) Tie yarn end to hook of Weight on Cast-on Comb.
(7) Push up Ribber Needle Bed to its top
position.
Ensure Ribber needles are correctly lined up in B
position.
IMPORTANT:
Ensure Link Pin on Ribber Carriage is joined properly to
Ribber Arm.
Depress both Pile Levers (marked blue) to widen
space between Knitter and Ribber Needle Bed
.
Knit from the left to the right.
If the yarns, pile yarn and ground yarn, get
entangled or loosened, pull the yarns back to yarn
balls at the back of Auto- Tension before moving
Carriage.
- 8 Slide P Carriage on Ribber from the left to the
right.
- 9 Knit from the right to the left.
- 10 On Knitter, push 5 needles back to A position at
both sides of fabric to have plain edge for seaming.
8
-
1 Slide P Carriage on Ribber from the left to the
right to push up needles to C position.
- 2 Set Stop Knob to
T
and right Side Lever to
.A,
then knit from the left to the right.
_
- 3 Slide P Carriage on Ribber from the left to the
right.
- 4 Kn it 1 row from the right to the left.
- 5 Remove stitches on Knitter using P Carriage.
Repeat
8- 1 "'-'8-
5 for main
knitting.
Suspend Hanger Combs with Weights after 10 rows and
advance them every 10 rows
upwards.
-
42
-

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents