Viessmann Vitocal 300-G Series Installation And Service Instructions Manual page 41

Heat pump with electric drive
Table of Contents

Advertisement

Power supply
(cont.)
Connection to EA1 extension
Condition: "Enable Smart Grid 7E80" must be at "1".
[{A
[{S
DE
DE
1 2
1 2
3 4
B
C
Fig. 29
EA1 extension
A
Connection to controller and sensor PCB
B
Floating N/O contact 1: The agreement of the
C
power supply utility may be required
Note
If Smart Grid is enabled ("Enable Smart Grid 7E80"
set to "1"), both inputs DE2 and DE3 cannot be
used for signals "External demand" or "External
blocking".
The power-OFF function is integral to Smart Grid.
Therefore do not connect the power-OFF signal to
terminals X3.6 and X3.7. Do not remove jumper.
Connection to heat pump control unit
Condition: "Enable Smart Grid 7E80" must be at "4".
X3.1 X3.1
B
C
D
A
Fig. 30
Main PCB
A
Connection X3.1 (L') on the luster terminals
B
Floating contact 1: The agreement of the power
C
supply utility may be required
Floating contact 2: The agreement of the power
D
supply utility may be required
A
[{D
[{{]
DE
0-10V
5 6
+ -
D
f-]
A
N
L1
E
Floating N/O contact 2: The agreement of the
D
power supply utility may be required
Power supply 1/N/PE 230 V/50 Hz
E
Note
If Smart Grid is connected to the two digital inputs on
main PCB ("Enable Smart Grid 7E80" set to "4"),
the external hook-up for the heating/cooling circuits
must not be switched on ("Remote control 2003"
set to "2"). Otherwise the Smart Grid will not be
active.
The power-OFF function is integral to Smart Grid. In
this case, therefore, the power-OFF signal must not
be connected to connections X3.6 and X3.7.
Installation sequence