Replacing An Mraid Riser (Riser 3) - Cisco SE-CL-L3 Installation Manual

Application services engine hardware
Table of Contents

Advertisement

Replacing an mRAID Riser (Riser 3)

e) Replace the top cover to the server.
f) Replace the server in the rack, replace cables, and then fully power on the server by pressing the Power button.
Figure 37: Location of the mLOM Card Socket Below the mRAID Riser
1
Position of horizontal mLOM card socket
Replacing an mRAID Riser (Riser 3)
The server has a dedicated internal riser that is used for either a Cisco modular storage controller card (RAID
or HBA) or the SATA interposer card for embedded software RAID. This riser plugs into a dedicated
motherboard socket and provides a horizontal socket for the installed card.
This riser can be ordered as the following options:
• UCSC-XRAIDR-220M5—Replacement unit for this mRAID riser.
• UCSC-MRAID1GB-KIT—Kit for first-time addition of this riser (includes RAID controller, supercap,
• UCSC-SATA-KIT-M5—Kit for first-time addition of this riser (includes SATA interposer for embedded
Cisco Application Services Engine Hardware Installation Guide
66
and supercap cable).
See also
Replacing a SAS Storage Controller Card (RAID or HBA), on page
See also
Replacing the Supercap (RAID Backup), on page
software RAID and SATA cables).
See also
Replacing a SATA Interposer Card , on page
2
Position of mLOM card thumbscrew
73.
75.
Maintaining the Server
69.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents