Burner installation
Secure the rear upper boiler wall (Fig. 39, Item 2) on
the back of the rear hood (Fig. 39, Item 1) and on the
side walls.
Secure the lower rear boiler wall (Fig. 40, Item 2) –
with the cut-out for the fill/drain cock at the bottom –
on the side walls (Fig. 40, Item 1 & 3).
Hook the front wall (Fig. 41, Item 3) at the bottom
centre into the plinth front (Fig. 41, Item 2).
Hook the front wall at the top into the edge of the front
hood (Fig. 41, Item 1).
We reserve the right to make any changes due to technical modifications.
Installation and maintenance instructions Logano GE315 • Issue 02/2006
Fig. 39
Installation of the upper boiler back wall
3
Fig. 40
Installation of the lower boiler back wall
3
Fig. 41
Front wall installation
2
1
2
1
2
1
2
29